Pad Foundations Poured for New College Building
The padstones are going in now ahead of the portal frame delivery next month.
There will be two structures on this site, forming a new college complex in West London. The site is a former gas works which has presented it's own challenges for all parties, but work is underway now on the portal framed building. The second building will be a SIPs building - using our own SIPs system (http://www.lowegroup.co.uk/sips)